Good framing of the backstop as the swing factor for Tait and Lee County. One thing I'd add to the downside case: PJM's generation queue still holds 134.4 GW of active requests (MFO, not firm MW), with average waits around 29 months (DC Hub (dchub.cloud), as of 2026-10-19). Most of that won't get built, but even a small slice clearing by 2030/31 would stack on top of a 12 GW backstop and push in the same direction as your $217/MW-day case. We track the queue live here if useful: https://dchub.cloud/connect