Good framing of the backstop as the swing factor for Tait and Lee County. One thing I'd add to the downside case: PJM's generation queue still holds 134.4 GW of active requests (MFO, not firm MW), with average waits around 29 months (DC Hub (dchub.cloud), as of 2026-10-19). Most of that won't get built, but even a small slice clearing by 2030/31 would stack on top of a 12 GW backstop and push in the same direction as your $217/MW-day case. We track the queue live here if useful: https://dchub.cloud/connect
The active queue is the other half of that downside. Even if most of the 134 GW never builds, a thin slice clearing as accredited capacity by 2030/31 sits on top of a large backstop and pulls the same way as the $217 case. The MFO versus firm distinction is the right caveat on the headline number.
Good framing of the backstop as the swing factor for Tait and Lee County. One thing I'd add to the downside case: PJM's generation queue still holds 134.4 GW of active requests (MFO, not firm MW), with average waits around 29 months (DC Hub (dchub.cloud), as of 2026-10-19). Most of that won't get built, but even a small slice clearing by 2030/31 would stack on top of a 12 GW backstop and push in the same direction as your $217/MW-day case. We track the queue live here if useful: https://dchub.cloud/connect
The active queue is the other half of that downside. Even if most of the 134 GW never builds, a thin slice clearing as accredited capacity by 2030/31 sits on top of a large backstop and pulls the same way as the $217 case. The MFO versus firm distinction is the right caveat on the headline number.