2 Comments
User's avatar
DC Hub's avatar

Good framing of the backstop as the swing factor for Tait and Lee County. One thing I'd add to the downside case: PJM's generation queue still holds 134.4 GW of active requests (MFO, not firm MW), with average waits around 29 months (DC Hub (dchub.cloud), as of 2026-10-19). Most of that won't get built, but even a small slice clearing by 2030/31 would stack on top of a 12 GW backstop and push in the same direction as your $217/MW-day case. We track the queue live here if useful: https://dchub.cloud/connect

Ian Nieboer's avatar

The active queue is the other half of that downside. Even if most of the 134 GW never builds, a thin slice clearing as accredited capacity by 2030/31 sits on top of a large backstop and pulls the same way as the $217 case. The MFO versus firm distinction is the right caveat on the headline number.